- Cooperate with field team(Subcontractor or site engineer), integrate RTN to NMS, move RTN to correct subnet
- Audit whether link configuration is same with design, and rectify according to design report if necessary
- Finish NE configuration (NE ID, IP, DCN, RMON monitoring, etc.) according to design or configuration rule
- Create logical link on topology
- Microwave E2E service configuration, Tasks included (but not limited to):
- Configure E2E service to support wireless site Integration
- Finish OAM and PRBS test to guarantee transmission connectivity
- Check with wireless team to confirm site is integrated and without alarm
- Clear all abnormal alarms and events and do related troubleshooting
- Make link Integration and service configuration report
- Configuration of PLA/EPLA/LAG/ERPS/LMSP if needs
- Cooperate with datacom team for new/swap GNEs configuration and testing
- Microwave acceptance test (NMS),Tasks included (but not limited to):
- Do service acceptance test on NMS refer to customer requirement :
1. Bit Errors, 2 Mbit/s Wayside E1 Services, Order wire Phone.
2. Data service test: Flow Control, Auto-Negotiation, Configurable Bandwidth, Detection of Abnormal Packets.
3. CES Service management test.
4. Packet Service Function test: E-line, E-lan and LACP test.
- Do microwave feature test on NMS refer to customer requirement : network management acceptance test, protection switching function acceptance test, ETH-QOS acceptance test, etc.